Haryana Vidyut Prasaran Nigam Ltd. have awarded the following contract to Mohan Energy Corporation Pvt. Ltd. for power transmission lines
220 KV SINGLE
CIRCUIT TRANSMISSION
LINE BETWEEN
NILOKHERI AND KARNAL
- Length : 20
Km
- Contract
completion : 15
months
- Scope :
Total turnkey
construction of
transmission
line
- Number of
locations : 66
- Type of
tower : 4 type
with all
extension upto
18m
- Conductor :
ACSR Zebra
length 61 Km
- Earth Wire :
7/3.15mm G.S.
Earth wire -
20km
Line was commissioned during April 2008.
220 KV DOUBLE CIRCUIT TRANSMISSION LINE BETWEEN YTPP (YAMUNANAGAR THERMAL POWER PROJECT) AND NILOKHERI
- Length : 52
Km
- Contract
completion : 15
months
- Scope :
Total turnkey
construction of
transmission
line
- Number of
locations : 174
- Type of
tower : 5 type
with all
extension upto
25m
- Conductor :
ACSR Zebra
length 315 Km
- Earth Wire :
7/3.15mm G.S.
Earth wire -
53km
Line was commissioned during october 2010
220 KV DOUBLE CIRCUIT TRANSMISSION LINE BETWEEN YTPP (YAMUNANAGAR THERMAL POWER PROJECT) AND ABDULLAPUR
- Length : 29
Km
- Contract
completion : 15
months
- Scope :
Total turnkey
construction of
transmission
line
- Number of
locations : 97
- Type of
tower : 5 type
with all
extension upto
25m
- Conductor :
ACSR Zebra
length 175 Km
- Earth Wire :
7/3.15mm G.S.
Earth wire -
29km
Line was commissioned during March 2009.
66 KV SINGLE
CIRCUIT TRANSMISSION
LINE BETWEEN LOHARA
AND BABAIN
- Length : 9
Km
- Contract
completion : 12
months
- Scope :
Total turnkey
construction of
transmission
line
- Number of
locations : 47
- Type of
tower : 3 type
- Conductor :
ACSR Panther
length 28 Km
- Earth Wire :
7/2.50mm G.S.
Earth wire - 9km
Line was commissioned during November 2009.
|