Mohan Energy Corporation is executing the 225 kV Single Circuit Interconnection Project from Cote D'Ivoire to Mali (Koutiala- Segou section). The length of the transmission line is 151 kms, which includes towers at 430 Locations. The whole project has been divided into 2 phases, phase-I includes 281 locations followed by phase-II with 149 locations.

Mohan Energy has successfully completed the phase-I in June, 2010.  It has signed the contract for Phase-II. As soon as this part of the contract becomes effective the interconnection project between Koutiala- Segou will be completed within 16 months. Phase-I of the project is being financed by GOI, Exim Bank and Phase-II by EBID, Lome.